A full fibre order starts with the address, then the plan, then the install. The network is confirmed before an engineer is booked. These are the steps from the postcode check to the day the line is live.
Check the address
Enter the install postcode on the availability check and choose the property. Ofcom predicted speeds are shown as Basic, Superfast, or Ultrafast, and a Broadbent plan is suggested. Those figures are a prediction. They are not a confirmed line.
The network is confirmed before install. Full fibre is sold from Openreach, CityFibre, and selected other networks where the checker finds them. If that product is not available, the team contacts you with alternatives. Plans are on the full fibre page.
Choose the plan
Full fibre is sold on a 12, 24, or 36 month contract. The minimum term is twelve months. After that the service continues monthly until you cancel. Cancelling before twelve months adds a £50 fee on top of any remaining contracted charges.
Catalog prices are ex VAT. A router, if you add one, is a one-off charge. Symmetrical full fibre includes a free static IPv4 address, assigned after the circuit is live. Other broadband products use a dynamic address unless you ask for a static IP.
The circuit does not include a traditional phone line. Cloud Voice seats can be added on the same order if you need hosted telephony.
Standard install
On Openreach, a standard managed install places the socket within 1 metre of the nearest power socket. The engineer connects the router, checks one device, and runs a sync test.
That install is included on 24 and 36 month Openreach full fibre. A 12 month contract carries a one-off install charge, shown at checkout.
A longer run inside the building
Premium and advanced installs cover a longer internal run. The fee for either is shown at checkout, ex VAT.
A premium Openreach install can place the socket up to 30 metres from the point where the fibre enters, and can include up to two data extension kits.
An advanced Openreach install can place the optical network terminal up to 100 metres from the customer splice point. The visit includes one external wall drill and one internal drill. The internal drill is not for concrete.
Other networks
Where the address is on another network, the standard install follows that network. Any fee is shown at checkout.
- CityFibre includes the lead-in to an external termination point. The optical network terminal is within 10 metres, on the same floor, surface mounted, with power within 1.5 metres. A 12 month contract can still carry an install fee. A non-standard install is a separate option for a business or a home. An extended or complex job needs a survey.
- Freedom Fibre includes up to 100 metres to the nearest network point, excluding construction, and 15 metres of external cable. Power is needed within 2 metres of the optical network terminal. Anything outside that needs a survey.
- Trooli places the optical network terminal within 5 metres of the external wall box and needs two power sockets. A non-standard install needs a survey.
- MS3 and ITS include a standard install on contracts longer than 12 months. A 12 month contract carries the install fee.
- Hyperoptic is not sold on a 12 month contract. The standard install carries a fee.
The router
Full fibre up to 1 Gbps uses the TP-Link EX230V. Faster full fibre uses the TP-Link EX820V, which is suitable up to 2.5 Gbps. Either can be ordered pre-configured and shipped to the install address.
You can use your own router if it supports the access type. Addressing for the circuit is still provided.
After you order
Payment is taken at checkout. The order is then provisioned with the wholesale partner. How long it takes depends on the network, any wayleave, and when an engineer is free. The appointment window is sent once the network operator confirms it. A go-live date is not fixed before that confirmation.
On the day
Someone needs to be at the property so the engineer can work safely. The visit fits the install you ordered. The socket or optical network terminal goes where that install allows, and a power socket has to be within the distance for that network.
On a standard Openreach visit the engineer connects the router, checks one device, and runs a sync test before leaving.
If nobody can give access, the conditions are unsafe, or the appointment is cancelled without reasonable notice, the visit can be charged as an aborted install. The charge is the wholesale aborted-visit rate, passed on at the retail markup. On CityFibre, an aborted install can be charged at £100 ex VAT.
Once the line is live
The circuit is ready when the network marks it live. Where the plan includes a static IPv4 address, it is assigned then. That address is not guaranteed to stay the same if the service is later moved or set up again.
The contract then runs for the term you chose. The UK team handles questions about the appointment and the visit.